Tel: 86-21-59170529/69125568
Fax: 86-21-69125568
Mob:+8615601850530
+8618512142852
E-mail: hehefilm@aliyun.com
Main Shanghai office add: 111,Building 5,No.1101,Huyi Road,Nanxiang, Jiading District, Shanghai,China
Factory add: Jiangsu province, Qidong city.
1. Construction personnel should wear good overalls and heat-resistant glasses to protect eyes, wear non-soaked gloves, boots;
2. The actual workplace, the machine equipment must be set up local exhaust devices;
3. The workplace should be set up to wash the cleaning equipment;
4. Use of non-sparking, grounding ventilation systems, qualified explosion-proof measures and safe electrical systems.
In addition: the need to pay attention to hot melt adhesive temperature is sensitive, in general, the summer and winter glue is still different, each year 3 April and 9, October is the temperature change, please control the amount of glue.
Previous: Hot Melt Adhesive Strip Overview